SERCO-GDOT Maintenance

Project Role: Prime Contractor
Owner/Agency: GDOT/SERCO
Project Location: Atlanta 
Start Date: April 1, 2010
Completion Date: April 31, 2015
Contract Value: $20,000,000


Project Description


World Fiber is currently working under Year 4 of this 5 year contract for performance based maintenance of the GDOT NaviGAtor Intelligent Transportation System (ITS). We are responsible for providing inventory control, device documentation management, asset management, equipment repair and replacement, and configuration management for the NaviGAtor system devices. This contract requires a comprehensive maintenance procedure, including detailed checklists, daily reporting, preventive maintenance measures, communications and power trouble shooting, and MOT. Phase 1 includes the replacement of 585 VDS, 39 PDS, 41 CMS, and 199 CCTV. Phase 2 includes the maintenance of 1,473 VDS, 39 PDS, 105 CMS, 478 CCTV, 102 RDS, 154 ramp meter systems, 24 hub buildings and over 200 centerline miles of fiber optic cable.


Project Responsibilities 


• 2,058 VDS
•78 PDS
• 146 CMS
• 677 CCTV
• 154 Ramp Meter Systems
• 24 Hub Buildings 
• 200+ Miles of Fiber Optic Cable