GA Department of Transportation/Serco

Location: 18 County Metro Atlanta, GA

Amount: $22M

Description:

World Fiber is currently working under year two of this five year contract for performance based maintenance of the Georgia DOT NaviGAtor Intelligent Transportation System (ITS). We are responsible for providing inventory control, device documentation management, asset management, equipment repair and replacement, and configuration management for the NaviGAtor system devices. This contract requires a comprehensive maintenance procedure, including detailed checklists, daily reporting, preventative maintenance measures, communications and power trouble shooting and MOT.

Phase 1 — Replacement of:

  • 41 CMS

  • 199 CCTV

  • 585 VDS

  • 39 PDS

Phase 2 — Maintenance of:

  • 105 CMS

  • 478 CCTV

  • 1473 VDS

  • 39 PDS

  • 102 RDS

  • 154 ramp meter systems

  • 24 Hub buildings

  • Over 200 centerline miles of fiber optic communications cable