ADVANCED TRAFFIC CONTROL MAINTENANCE: CITY OF ATLANTA, GEORGIA.

Project Role: Prime Contractor
Owner/Agency: GDOT
Project Location: Atlanta 
Start Date: January 1, 2008
Completion Date: June 31, 2013
Contract Value: $ 5,395,600.02


Project Description


World Fiber Technologies, Inc. has been performing Advanced Traffic Control (ATC) maintenance activities at existing State Routes and local roads and streets within the City of Atlanta since 2008. The scope of our work is limited to the inside of the cabinet where the computer controlling the intersection resides. This is an “on-call” type contract for World Fiber to remove and/or replace obsolete or damaged signal equipment inside the cabinets as well as installing new equipment where required. We have maintained and upgraded over 148 cabinets at various intersections throughout the downtown Atlanta area.

Project Responsibilities

  • Signal equipment

  • CCTV

  • DMS

  • Controller cabinets

  • Field switches

  • Modem hardwire

  • 1” & 2” conduit

  • Type 2 Network switches

  • Power service and demarcation points

  • Traffic control

  • Work zone Law Enforcement

  • Testing