Prime contractor for the Atlanta Georgia metro area High Occupancy Toll (HOT) Lanes deployed by Georgia State Road and Tollway Authority (SRTA). 

The first project of its kind in Georgia and the ninth in the Nation

Installed all the infrastructure and devices required for the HOT Lanes project:

  • Fiber optic trunk lines and drop cables

  • Power services

  • ITS

  • Tolling devices

We installed:

  • 51 new structures and foundations for tolling equipment

  • Overhead signage

  • 35 horizontal extension arms were attached to existing structures

  • A 5.8 GHz wireless radio system was also installed for system redundancy during construction

Challenges:

  • Maintenance of Traffic (MOT) for the erection of toll gantry structures with moving traffic

  • Provide ample time for testing and integration

  • Since this major project, we have grown our expertise from similar managed lane and tolling experience with projects such as:

  • Texas DOT LBJ Express Managed Lanes Project

  • Texas DOT NTE Express Managed Lanes Project